Subsidy up to ₹78,000 for homes (Tamil Nadu adds ₹22,000) · we help you claim itWhatsApp +91 62385 77759

Solar Daily Brief #1 — 3 October 2026

Three developments this week affect what a Trivandrum, Kollam or Kanyakumari homeowner pays for solar. Short version below; sources linked.

2026-10-03Sources linked
1

Tamil Nadu adds a ₹22,000 state top-up — Kanyakumari homes can now get ₹1 lakh

Tamil Nadu's revised 2026–27 budget announced a state rooftop-solar subsidy that works alongside PM Surya Ghar. For a 3 kW home system the central ₹78,000 is joined by ₹22,000 from the state, a combined ₹1 lakh. ₹50 crore has been set aside for the scheme.

Industry reports say TNPDCL opened applications on its unified rooftop-solar portal from 21 September, but the budget coverage we found does not state a start date, so confirm on the portal before you pay any advance.

What it means for Kanyakumari: net cost of a 3 kW system drops to roughly ₹0.7–1.1 lakh. If you were waiting, the case for acting got stronger.

Sources: DT Next: TN Budget 2026 – Rs 1 lakh solar subsidy · Energetica India: Tamil Nadu announces residential rooftop solar subsidy of up to INR 1 lakh · Deccan Chronicle: TN's subsidy scheme to bring down rooftop solar panel cost

2

PM Surya Ghar crosses 50 lakh homes

The central scheme passed 50 lakh households in early August, with about 14.8 GW of rooftop capacity commissioned and over ₹28,000 crore paid out as direct subsidy. Installations ran at roughly 16,300 a day in July, up from about 5,000 a day in October 2025. The stated target is one crore homes by FY 2026–27.

What it means for you: faster vendor onboarding and portal processing, but also heavy demand on installers and DISCOM meters — book early and get dates in writing.

Sources: pv magazine: India's rooftop solar scheme surpasses 5 million households · ANI: Rooftop solar installations cross 16,000 a day under PM Surya Ghar

3

Kerala: new KSERC metering rules and reports of net-meter delays

KSERC's 2025 renewable-energy regulations, with billing changes from 2026, split rooftop systems into net metering for small systems (reported as 1–3 kW, or up to 5 kW with a battery) and net billing for larger ones, where exported units are credited at a low settlement rate (reported around ₹2.8–3.1 per unit) rather than at your retail tariff.

Separately, installers have been reporting delays in the supply of net meters, especially for some three-phase connections, in August and September. Treat the installer reports as indicative, and ask your KSEB section office about the current wait.

What it means for you: in Kerala, size your system to your daytime use rather than oversizing for export, and ask your installer to state in writing who is responsible if the net meter is late.

Sources: SolarQuarter: KSERC introduces new renewable energy regulations · GSL Energy (installer blog): KSEB net meter delay in Kerala

16,328residential rooftop systems installed per day across India in July 2026 (PM Surya Ghar).

From our desk

We added the Tamil Nadu top-up to the solar calculator (choose 'Kanyakumari – Tamil Nadu') and published three project case studies. Next issue: what the Kerala net-billing change does to payback for 5 kW and 10 kW homes.

Summaries are based on the linked reports; some figures come from trade or installer sources and are marked as reports. Check official portals before acting.

Get your free solar savings report

Tell us your monthly bill. We'll size the system, apply the PM Surya Ghar subsidy and connect you with a verified installer — no spam, no obligation.

Get Free Quote →Try the Calculator
Free QuoteCalculator