How to Compare Solar Quotes in Kerala: 12-Point Checklist

Compare solar installer quotes properly: bill of material, DCR modules, inverter, warranty, subsidy handling, net metering fees, payment terms and red flags.

By The Solar Daily Editorial TeamPublished 2026-10-03Updated 2026-10-036 min read

Part of the complete guide: Solar cost (complete guide)

Quick answer

Compare quotes line by line on the same basis: module brand, DCR status and wattage; inverter brand and warranty; structure material; earthing and protection; who handles KSEB/TNPDCL and subsidy paperwork; payment schedule; and written warranties. The cheapest quote is rarely the best value if it omits any of these.

The 12-point comparison table

#CheckGood sign
1Module brand, model, Wp, DCRNamed brand, BIS/ALMM, DCR stated
2Number of modulesMatches kW (e.g. 6 × 540 Wp ≈ 3.2 kWp)
3Inverter brand, rating, warranty5–10 years, local service centre
4Structure materialHot-dip galvanised or aluminium, wind-rated
5Cables, ACDB/DCDB, SPDCopper, proper ratings, surge protection
6Earthing and lightning arrestorSeparate earth pits, resistance report
7Net-metering and subsidy paperworkIncluded, with named responsible person
8Subsidy treatmentQuoted at full price; subsidy credited to you
9Warranty25-yr module performance, ≥5-yr workmanship in writing
10Payment scheduleStaged (e.g. 20/60/20), not 100% advance
11TimelineInstallation in days; commissioning timeline stated
12ReferencesVerifiable installations nearby

Red flags

  • Price far below ₹55,000/kW without explanation
  • 'Equivalent' or unnamed modules and inverters
  • Subsidy deducted from the quote as a 'discount'
  • Full advance payment demanded
  • No written warranty or no GST invoice

Get help

We compare quotes for free through installer matching, or audit a quote in detail with the Solar Advisor service.

Always verify. Subsidy, tariff and price figures change. Confirm with the official portal, KSEB/TNPDCL and a written quote before paying any advance. Figures here are indicative for South Kerala & Kanyakumari.

Frequently asked questions

How many solar quotes should I get?

Two or three comparable written quotes is enough.

Is the cheapest solar quote the best?

Not necessarily; confirm DCR modules, structure quality, earthing and warranty first.

How much advance should I pay?

Typically 20–30% on order, balance in stages against delivery and commissioning.